Black Friday · ends Mon 30 Nov: Plus S$5/mo or S$30 lifetime. Ends Mon 30 Nov.

Get the deal
← Search

Engineering change order salary in Singapore

Jobs in Singapore that ask for Engineering change order pay a median $3,500 a month, based on 24 job postings. It's a hard requirement in 79% of them, most often for Project Engineer roles.

Job postings

24

24 postings

Median pay

$3,500

24 postings

Pay by experience

Postings asking for Engineering change order: 24 that state the experience needed. Median of each posting's advertised range.

ExperienceMedian payPostings
0–1 yr$3,500 – $4,5005 postingsindicative
2–3 yrsMost common$3,500 – $5,00012 postings
4–5 yrsSign in to see7 postingsindicative
Sign in free to see pay as you move up

Want to learn Engineering change order? We're lining up member discounts on courses.

Sign in to join

How often is it actually required?

Required 79%Preferred 13%Mentioned 8%

Top roles asking for this

“vs role” is the median for postings that ask for Engineering change order against the median for all of that role’s postings. Postings that ask for it can also be more senior, so read it as a signal, not a raise.